6.9 C
Edmonton
Friday, November 6, 2026

Rio Tinto must face lawsuit in US over Mongolian mine cost overruns

Must read

A US judge said Rio Tinto Plc must face an investor lawsuit accusing the Anglo-Australian mining giant of concealing delays and huge cost overruns at a Mongolian copper and gold mine owned by Turquoise Hill Resources Ltd, in which Rio Tinto has a majority stake.

- Advertisement -

Popular

LEAVE A REPLY

- Advertisement -

Latest article

Dream Big with a Home Equity Loan

Post Content

0% intro APR until 2024 is 100% insane

Post Content

Dream Big with a Home Equity Loan

Post Content

Post Title

Nearly one-in-three Republicans thinks Taylor Swift is involved in a covert government effort to help President Joe Biden win the 2024 election. CNN's Harry...